The Challenge
Rio@640 needed the mechanical room on its 16th floor cleared of major HVAC and mechanical infrastructure. The equipment was large and heavy, and the room sat high in an occupied downtown tower. Every piece had to come out safely and efficiently, travel through the building, and leave the site by truck on a busy city street.
Work on projects this complex, with factors such as the height and setting, leaves little room for error. It takes detailed planning, specialized equipment, and tight coordination of cranes, rigging, trucking, and material handling.